Inquiry Library

Midland Metro (Birmingham City Centre Extension, Land Acquisition and Variation) Order 2016

INQUIRY DOCUMENTS LIST

This section lists the documents that were submitted as part of the TWAO Inquiry that was held in November/December 2014.

CD01 [MMD/0.1] Statement of Case

CD02 [MMD/1.2] Midland Metro (Birmingham City Centre Extensions etc) Order 2005

CD03 [MMD/1.4] Draft Order

CD04 [MMD/1.5A] Order Works Plans

CD05 [MMD/1.5B] Order Land Plans

CD06 [MMD/1.6] Newspaper Notices

CD07 [MMD/3.2] 2005 Order Works Plans

CD08 [MMD/3.4] Order Statement of Aims

CD09 [MMD/3.5] BCC Paradise Circus CPO

SoS Signature

Stopping Up Order

CD10 [MMD/4.4] Order Explanatory Memorandum

CD11 [MMD/4.5A] Order Application

CD12 [MMD/4.5B] Consultation Report

CD13 [MMD/4.5C] Order Environmental Statement Vol. 1 - Main Report

CD14 [MMD/4.5D] Order Environmental Statement Vol.2 - Technical Appendices

MMD 300207 CS21 DRA 0000 0101 P1

MMD 300207 CS21 DRA 0000 0201 P1

MMD 300207 CS21 DRA 0000 0202 P1

MMD 300207 CS21 DRA 0000 0203 P1

MMD 300207 CS21 DRA 0000 0901 P1

MMD 300207 CS21 DRA 0000 1001 P1

MMD 300207 CS21 DRA 0000 1101 P1

MMD 300207 CS21 DRA 0000 1102 P1

MMD 300207 CS21 DRA 0000 1201 P1

MMD 300207 CS21 DRA 0000 1202 P1

MMD 300207 CS21 DRA 0000 1401 P1

Vol 2E Transport Assessment

CD15 [MMD/4.5E] Order Environmental Statement Vol. 3 - Non Technical Summary

CD16 [MMD/4.5F] Order Funding Statement

CD17 [MMD/4.5G] Order Book of Reference

CD18 [MMD/4.5H] Order Declaration to the Status of Applicant

CD19 [MMD/4.5I] Order Cost Estimate

CD20 [MMD/4.5J] Order Planning Request

CD21 [MMD/5.1] BCC Letter to Secretary of State for Transport confirming its support for the Order 2005, dated 25th April 2003

CD22 [MMD/5.2] 2005 Order Inspector's Report

CD23 [MMD/5.3] 2005 Order Secretary of State for Transport's Decision Letter

CD24 [MMD/5.5] 2005 Order Land Plans

CD25 [MMD/6.6] CSQ Construction Strategy

CD26 [MMD/7.5] Birmingham Unitary Development Plan (BCC,2005)

CD27 [MMD/7.8] West Midlands Local Transport Plan 2011-2026 (Centro 2011)

CD28 [MMD/7.9] Changing Gear: Transforming Urban Movement Through Walking & Cycling in Birmingham

CD29 [MMD/8.2] European Commission Transport White Paper 2011: Roadmap to a Single European Transport Area

CD30 [MMD/8.4] Greater Birmingham & Solihull Local Enterprise Partnership Strategy for Growth (2013)

CD31 [MMD/8.13A] Towards a World Class Integrated Transport Network (Centro 2013)

CD32 [MMD/8.13B] Integrated Transport Prospectus

CD33 [MMD/8.15] Vision for Movement (BCC 2010)

CD34 [MMD/9.1] National Planning Policy Framework (NPPF 2012)

CD35 [MMD/9.21A] Birmingham Development Plan 2031 Pre-submission Draft (BCC 2013)

CD36 [MMD/9.21B] The Birmingham Plan 2031 Submission Draft (BCC 2014)

Birmingham Plan Submission Policies Map incl. Minor Modifications 2014

Birmingham Plan Submission Draft Modifications 2014

CD37 [MMD/09.22] The Big City Plan - City Centre Masterplan (BCC 2011)

CD38 [MMD/9.26] Colmore Row and Environs Conservation Area Appraisal SPD (BCC 2006)

CD39 [MMD/10.3] Draft Design Statement (Centro 2003)

CD40 [MMD/10.6] Decision Notice Stephenson Street-Centenary Square

Site Location Plan

CD41 [MMD/10.27] Plan OX4500-20-GA-108 rev 1

CD42 [MMD/10.29] Illustrative plans of Victoria Square Stop platforms

CD43 [MMD/10.31] Historic Impact Assessment for Colmore Row & Environs Conservation Area

CD44 [MMD/13.3] Enterprise Zone Investment Plan

CD45 [MMD/13.4] DfT Announcement 'Devolving Local Major Transport Schemes' 18.09.2012

CD46 [MMD/13.5] Letter from GBSLEP Local Major Scheme Priorities for 2015-16 to 2018-19, 31.07.2013

CD47 [[MMD/13.8A] Utililities Contract Regulations 2006

CD48 [MMD/13.8B] Centro Constitution 2013

CD49 [MMD 20.1] Transport & Works (Applications and Objections Procedure) (England & Wales) Rules 2006

CD50 [MMD 20.2] Transport & Works Act (Inquiry Procedures) Rules 2004

CD51 [MMD 20.3] Transport & Works Act Orders - A Brief Guide

CD52 [MMD 20.4] Transport & Works Act 1992

CD53 [MMD 20.5] SI 1992 No.3270 Transport & Works (Model Clauses for Railways and Tramways) Order 1992

CD54 [MMD 20.6] Circular 3/94 Awards of Costs in Applications Proceedings Under Section 6 of Transport & Works Act 1992, DfT

OBJECTIONS & LETTERS OF SUPPORT

OBJ/1 National Grid

OBJ/1/WD National Grid - withdrawal letter (29 Sept 2014)

OBJ/2 SHP Opportunity Fund General Partner Ltd

OBJ/2/WD SHP Opportunity Fund General Partner Ltd - withdrawal letter (9 Oct 2014)

OBJ/3 Now Leisure Ltd

OBJ/4 Western Power Distribution (West Midlands) Plc

OBJ/4/WD Western Power Distribution (West Midlands) Plc - withdrawal (12 Aug 2014)

OBJ/5 Friends First Managed Pension Funds Ltd

OBJ/5/WD Friends First Managed Pension Funds Ltd - withdrawal letter (5 Feb 2014)

OBJ/6 Birmingham City Council

OBJ/6/WD Birmingham City Council - withdrawal letter (2 July 2014)

OBJ/7 Argent (Paradise) Ltd

OBJ/7/WD Argent (Paradise) Ltd - withdrawal letter (17 Oct 2014)

OBJ/8 Arena Central Developments LLP

OBJ/8/WD Arena Central Developments - withdrawal letter (22 Oct 2014)

OBJ/9 HRB Hotel Company Ltd

OBJ/9/WD HRB Hotel Company Ltd - withdrawal letter (22 Oct 2014)

OBJ/10 Beneficial House (Birmingham) Regeneration Plc

OBJ/10/WD Beneficial House (Birmingham) Regeneration Plc - withdrawal (6 Aug 2014)

OBJ/11 VSH Nominee 1 Ltd & VSH Nominee 2 Ltd

OBJ/12 Birmingham City University

OBJ/12/WD Birmingham City University - withdrawal letter (1 May 2014)

OBJ/13 One Birmingham Ltd

OBJ/13/WD One Birmingham Ltd - withdrawal letter (27 Oct 2014)

Letters of Support

SUPP/1 Birmingham City Council (20 Oct 2014)

CENTRO'S PROOFS OF EVIDENCE

Scheme Development and Implementation - Peter Adams

CEN/P1.1/SCH (Proof)

CEN/P1.2/SCH (Summary)

CEN/P1.3/SCHExhibits

Economic Case / Value for Money - Neil Chadwick

Engineering - Gavin Last

Cultural Heritage - Chris Surfleet

Townscape - Michelle Bolger

Transport - Paul Parkhouse

Noise and Vibration - Andrew Monk-Steel

Planning - Paul Ellingham

CENTRO'S REBUTTALS

CEN/R1.1/OBJ11/ENG Rebuttal by Gavin Last (Engineering) in response to proofs of David Martin & James Parsons (VSH)

CEN/R1.2/OBJ11/CUL Rebuttal by Chris Surfleet (Cultural Heritage) in response to proof of Chris Miele (VSH)

CEN/R1.3/OBJ11/TRA Rebuttal by Paul Parkhouse (Transport) in response to proofs of David & Simon Tucker (VSH)

CEN/R1.4/OBJ11/PLA Rebuttal by Paul Ellingham (Planning) in response to proof of Paul Burley (VSH)

GENERAL DOCUMENTS SUBMITTED BY CENTRO

CEN/GEN1 Guidance On Tramways (Railway Safety Publication 2)

CEN/GEN2 Guidance on Transport Assessment, DfT 2007

CEN/GEN3 Inclusive Mobility, DfT 2002

CEN/GEN4 Pedestrian Comfort Guidance for London, TfL 2010

CEN/GEN5 Manual for Streets, DfT 2007

CEN/GEN6 Navigation Street Complex of Overbridges Hill Street Bridge

CEN/GEN7 Navigation Street Bridge Assessment Bridgeguard 3 Assessment Report

CEN/GEN8 2005 Order Inquiry Proof of Evidence Stephen Mitchell

CEN/GEN9 Control of Pollution Act P III Noise

CEN/GEN10 Environmental Protection Act Section 80

CEN/GEN11 Noise Policy Statement for England DEFRA

CEN/GEN12 Guidelines for Community Noise

CEN/GEN13 Operational Noise and Vibration Phase 2 Reports, UKTram

CEN/GEN14 Noise Insulation Regulations 1998

CEN/GEN15 Argent Parameter Planning Application Plans 2012

CEN/GEN16 DRA-0000-0191 Kerb Drawing

CEN/GEN17 DRA-0000-0192-P1 DKE Pole Location Drawings

CEN/GEN18.1 DRA 0000-0145 P2 Long Section Plan

CEN/GEN18.2 DRA 0000-0146 P2 Long Section Plan

CEN/GEN18.3 DRA 0000-0147 P2 Long Section Plan

CEN/GEN19.1 Visual 1 Pole Option

CEN/GEN19.2 Visual 2 Pole Option

CEN/GEN20.1 Newspaper Notice of Inquiry 3 Nov 2014

CEN/GEN20.2 Newspaper Notice of Inquiry Letter 3 Nov 2014

CEN/GEN21 Railway Applications - Electromagnetic Compatability - Standard document BS EN 50121-4:2006 (paper copy only)

DOCUMENTS SUBMITTED BY CENTRO DURING INQUIRY

Submitted on Day One (19 Nov 2014)

CEN/INQ1 Detailed information about proposed site visit to Victoria Square House (19 Nov 2014)

CEN/INQ2 Response from Winckworth Sherwood to Inspector's query about obtaining report from Network Rail (19 Nov 2014)

Submitted on Day Two (20 Nov 2014)

CEN/INQ3 Centro's opening statement (20 Nov 2014)

CEN/INQ4 Compliance with Statutory Procedures TWA Act 1992

Submitted on Day Three (21 Nov 2014)

CEN/INQ5 Note on Capital Cost for VSH Alternative Routes (20 Nov 2014)

CEN/INQ6 Note on Capital Cost for VSH Alternative Routes (21 Nov 2014)

CEN/INQ7 Non Intrusive Report (Nov 2014)

CEN/INQ8 TWAO Unit comments to Centro on order (12 Nov 2014)

CEN/INQ9 Response from Centro to TWAO Unit re. comments on order (21 Nov 2014)

CEN/INQ9.1 Application Draft Order as REVISED

CEN/INQ9.2 "Filled Up" Order (submitted to inquiry 11 Dec 2014)

CEN/INQ9.3 Covering email from Centro explaining "Filled Up" order (11 Dec 2014)

CEN/INQ10 Programme Statement by Centro (21 Nov 2014)

CEN/INQ11 Redacted compromise agreement between Birmingham City University & Birmingham City Council (Dec 2013)

CEN/INQ12 WebTAG Proportionate Update, DfT (Oct 2013)

Submitted on Day Four (25 Nov 2014)

CEN/INQ13 Plan showing Ethel Street - annotated version of Exhibit 5a of CEN/P.3.3/ENG

CEN/INQ14.1 Note on Hall of Memory by Chris Surfleet (21 Nov 2014)

CEN/INQ14.2 Letter from Birmingham City Council regarding Hall of Memory (21 Nov 2014)

CEN/INQ15.1 Plan showing Victoria Square House - existing situation

CEN/INQ15.2 Plan showing Victoria Square House - proposed situation

CEN/INQ16 Note with reference to scaffolding to buildings by Gavin Last (25 Nov 2014)

CEN/INQ17 Launch of international design competition for regeneration of Centenary Square in Birmingham (20 Oct 2014)

CEN/INQ18 Note on Costs of Complementary Highway Measures

CEN/INQ19 Inquiry Note in relation to Wheel Squeal Noise by Andrew Monk-Steel (24 Nov 2014)

CEN/INQ20 Note on Base Capital Costs

Submitted on Day Five (26 Nov 2014)

CEN/INQ21.1 Pinfold Street Footway Widths by Paul Parkhouse (pavement widths) (26 Nov 2014)

CEN/INQ21.2 Plan accompanying Paul Parkhouse note on pavement widths

CEN/INQ22 Note on objections considered at the inquiry into the 2005 Order (26 Nov 2014)

CEN/INQ23.1 Covering email re. proposal T45 reference - Paul Ellingham submission (27 Nov 2014)

CEN/INQ23.2 Extract from the Birmingham City Unitary Development Plan 2005 Proposals Map showing T45 reference - interactive

EN/INQ23.3 Extract from the Birmingham City Unitary Development Plan 2005 Proposals Map showing T45 reference - available on paper only

CEN/INQ24 Archaeology Strategy SPG (Supplementary Planning Guidance), Birmingham City Council (Aug 2004)

CEN/INQ25 Nature Conservation Strategy SPG (Supplementary Planning Guidance), Birmingham City Council (Mar 1997)

CEN/INQ26 Option A and Option B Capital Costs Changes, Steer Davies Gleave (1 Dec 2014)

Network Rail Documents

CEN/INQ/27 RBS2 Br2 - Bearing Stiffener Re-Assessment Span 2 (2007)

CEN/INQ/28 RBS2 Br2 2A 2B 2C - Assessment Report (2004)
See CEN/GEN/7 RBS2 Br2 2A 2B 2C - Section 117 Assessment Report (2006)

CEN/INQ/29 RBS2 Br2a - HB Assessment Report (2007)

CEN/INQ/30.1 RBS2 Br2b - Grillage Analysis of Span 2B Final (2007)

CEN/INQ/30.2 RBS2 Br2b - PTSI Report Stage 1 (2007)

CEN/INQ/30.3 RBS2 Br2b - PTSI Report Stage 2 (2007)

CEN/INQ/31.1 RBS2 Br2c - 13806 Half Joint Assessment Span 2C 01 Rev (2010)

CEN/INQ/31.2 RBS2 Br2c - Navigation Street Grillage 2C Report (2007)

CEN/INQ/31.3 RBS2 Br2c - Navigation Street Span 2C Final Assessment Report (2013)

CEN/INQ/31.4 RBS2 Br2c - PTSI Report Stage 1 (2007)

CEN/INQ/31.5 RBS2 Br2c - PTSI Report Stage 2 (2007)

CEN/INQ/31.6 RBS2 Br2c - RBS2 2C Interpretative Report Rev A-Full (2010)

CEN/INQ/32.1 RBS2 Br3 - Bridge Assessment Report (2004)

CEN/INQ/32.2 RBS2 Br3 - Bridge Assessment Report BE4 (2005)

See CEN/GEN/6 RBS2 Br3 - Non- Linear Assessment Report (2007)

Engineering Papers

CEN/INQ/33 Navigation Street Bridge technical note (10 Dec 2014)

CEN/INQ/34 Navigation Street Bridge details and assessment by Gavin Last (10 Dec 2014)

CEN/INQ/35 Covering email from Centro regarding engineering notes (10 Dec 2014)

CEN/INQ/36.1 Inquiry Note in relation to Proposed Planning Condition 10 (11 Dec 214)

CEN/INQ/36.2 BS 8233 2014 Guidance on sound insulation and noise reduction for buildings - paper copy only

CEN/INQ/36.3 BS ISO 14837-1-2005 Mechanical Vibration - Ground-borne noise and vibration arising from rail systems - part 1: General Guidance

CEN/INQ37.1 Note on Economic Appraisal made in response to Inspector request for information re. benefit:cost ratio X14 (15 Dec 2014)

CEN/INQ37.2 Independent Review Approval Note to accompany Note on Economic Appraisal

CEN/INQ38 Centro's response to Inspector request for information re. funding X13 (15 Dec 2014)

SUBMITTED AT INQUIRY (resumed 17-19 December 2014)

CEN/INQ39.1 Note in relation to changes to the planning draft conditions (12 Dec 2014)

CEN/INQ392 Revised Planning Conditions with track changes

CEN/INQ39.3 Revised Planning Conditions (final version)

Submitted after:

CEN/INQ40 Note on Funding in response to Inspector's questions on 18 December (22 Dec 2014)

CEN/INQ41 Note in response to Tucker Review of CEN/INQ 6 (22 Dec 2014)

CEN/INQ42.1 Centro Costs Application against VSH (9 Jan 2015)

CEN/INQ42.2 Pinsent Masons letter seeking adjournment (11 Nov 2014)

CEN/INQ42.3 Winckworth Sherwood letter in response to VSH letter of 11 November seeking adjournment (12 Nov 2014)

CEN/INQ42.4 Summary Grounds for Contesting VSH's Judicial Review Claim

CEN/INQ43 Closing Submissions made by Andrew Newcombe QC (16 Jan 2015)

CEN/INQ44 Centro response to VSH costs application (16 Jan 2015)

CEN/INQ45.1 Final Reply to VSH's Response to Centro's Application for Costs (23 Jan 2015)

CEN/INQ45.2 Annex to Final Costs Application Response

CEN/INQ45.3 Appendix to Final Costs Application Response

OTHER PARTIES' DOCUMENTS

OBJECTORS' STATEMENTS OF CASE

HRB Hotel Company Ltd

OP/SOC1/OBJ9 Statement of Case submitted by HRB Hotel Company Ltd (Aug 2014)

OP/SOC2.1/OBJ11 Statement of Case submitted by VSH Nominee 1 Ltd & VSH Nominee 2 Ltd

OP/SOC2.2/OBJ11 Appendices to Statement of Case

One Birmingham Ltd

OP/SOC3/OBJ13 Statement of Case submitted by One Birmingham Ltd

OBJECTORS' PROOFS OF EVIDENCE

Submitted by VSH Nominee 1 Ltd & VSH Nominee 2 Ltd

Planning - Paul Burley

Heritage Considerations - Dr Chris Miele

Access and Building Maintenance - David Martin

Transportation and Safety Impacts - David and Simon Tucker

Navigation Street Bridge Structures - James Parsons

OBJECTORS' REBUTTALS

Submitted by VSH Nominee 1 Ltd & VSH Nominee 2 Ltd

OP/R1.1/OBJ11 Rebuttal by Paul Burley in response to Centro - proofs of Paul Ellingham (Planning) & Peter Adams (Scheme Development & Implementation)

OP/R2.1/OBJ11 Rebuttal by Chris Miele in response to Centro - proofs of Chris Surfleet (Cultural Heritage) & Michelle Bolger (Townscape)

OP/R3.1/OBJ11 Rebuttal by David Martin in response to Centro - proofs of Gavin Last (Engineering) & Peter Adams (Scheme Development & Implementation)

OP/R4.1/OBJ11[D] Rebuttal by David Tucker in response to Centro - proofs of Neil Chadwick (Economic Case) & Paul Parkhouse (Transport)

OP/R4.1/OBJ11[S] Rebuttal by Simon Tucker in response to Centro - proofs of various witnesses (Transportation & Safety Impacts)

OP/R5.1/OBJ11 Rebuttal by James Parsons in response to Centro - proofs of Gavin Last (Engineering) & Peter Adams (Scheme Development & Implementation)

DOCUMENTS SUBMITTED BY OBJECTORS DURING INQUIRY

Submitted by VSH Nominee 1 Ltd & VSH Nominee 2 Ltd

OP/INQ1/OBJ11 Orientation map

OP/INQ2/OBJ11 Email from VSH to TWA Unit estimating time required at inquiry (1 July 2014)

OP/INQ3/OBJ11 Unit letter from TWAO Unit - notification to hold inquiry (3 July 2014)

OP/INQ4/OBJ11 TWAO Unit letter - date of inquiry (8 Sept 2014)

OP/INQ5/OBJ11 Email from VSH to Winckworth Sherwood re. site visit (8 Oct 2014)

OP/INQ6/OBJ11 Accommodation form for inquiry at 43 Temple Row - paper only

OP/INQ7/OBJ11 Email from Winckworth Sherwood re. accommodation form (19 Nov 2014) - paper only

Missing appendices to Appendix 2 of Paul Burley's evidence: [OP/P1.2/2/OBJ11]

OP/INQ8/OBJ11 Cabinet report re. Project Definition Document (21 Oct 2013)

OP/INQ9/OBJ11 Cabinet report re. Project Definition Document - Appendix A

OP/INQ10/OBJ11 Cabinet report re. Project Definition Document - Appendix B

OP/INQ11/OBJ11 Cabinet report re. Project Definition Document - Plan of Navigation Street Link Option (part of Appendix B)

OP/INQ12/OBJ11 Covering email from VSH to PO re. submissions (20 Nov 2014)

OP/INQ13.1/OBJ11 Response from VSH to Inspector's query about obtaining report from Network Rail (19 Nov 2014) & Section 250 of the Local Government Act 1972

Submitted on Day Two (20 Nov 2014)

OP/INQ14/OBJ11 Hall of Memory List Entry Summary

OP/INQ15/OBJ11 VSH Opening Statement

Submitted on Day Three (21 Nov 2014)

OP/INQ16/OBJ11 Snow Hill bus interchange map

OP/INQ17/OBJ11 Simon Tucker Note

OP/INQ18/OBJ11 James Parsons Note

Submitted at Inquiry (resumed 17-19 December 2014)

OP/INQ19/OBJ11 Indicative VSH route (Dec 2014)

Submitted on 18 Dec 2014

OP/INQ20/OBJ11 Plan of Paradise Circus - right turn lane into basement

OP/INQ21/OBJ11 Google image screen shot of Bilston Road, Wolverhampton

OP/INQ22/OBJ11 Photo of Crossover constructed to the east of Stephenson Street Stop (16 Dec 2014)

OP/INQ23/OBJ11 VSH/DTA comparison of CEN/INQ 6

OP/INQ24/OBJ11 Note produced by James Parsons and Gavin Last regarding the Network Rail approval process (30 Dec 2014)

OP/INQ25.1/OBJ11 VSH costs application (9 Jan 2015)

OP/INQ25.2/OBJ11 Exhibits to costs application

OP/INQ26/OBJ11 Closing Submissions from John Steel QC on behalf of VSH (9 Jan 2015)

OP/INQ27.1/OBJ11 Response to Centro's costs application (16 Jan 2015)

OP/INQ27.2/OBJ11 Appendices to response to Centro's costs application

OP/INQ28/OBJ11 Final Reply to Centro's Response to VSH's Application for Costs (23 Jan 2015)

GENERAL INQUIRY DOCUMENTS

X1 - Initial Notification Letter from TWA Unit (08.09.2014)

X2 - Statement of Matters (issued by TWA Unit 23 Sept 2014)

X3 - Inspector's Pre-Inquiry Note (30 Sept 2014)

X4.1 Email from Programme Officer to Centro and VSH Nominee inviting comments on Edition A of inquiry order of events (6 Nov 2014)

X4.2 Edition A of Inquiry Order of Events

X4.3 Letter from VSH to Inspector seeking adjournment (11 Nov 2014) plus attachments

X4.4 Centro's response to VSH letter of 11 Nov seeking adjournment (12 Nov 2014)

X4.5 Timings request from Centro (3 Nov 2014)

X4.6 Timings request from VSH (3 Nov 2014)

X4.7 Centro's availability of witnesses & venue until Christmas 2014 - response to request by PO (12 Nov 2014)

X4.8 VSH availability until Christmas - response to request by PO (12 Nov 2014)

X4.9 VSH letter to PO providing bundle of correspondence with Centro (13 Nov 2014)

X4.9.1 VSH letter - attachment 1

X4.9.2 VSH letter - attachment 2

X4.10 PO letter to VSH - application for adjournment declined (14 Nov 2014)

VSH documents in connection with application for Judicial Review

X5.1 VSH letter to PO stating intention to make urgent application to High Court (14 Nov 2014)

X5.2 Email to PO re. VSH application for Judicial Review (17 Nov 2014)

X5.3 Application for urgent consideration - VSH application for Judicial Review

X5.4 Chronology - VSH application for Judicial Review

X5.5 Claim Form - VSH application for Judicial Review

X5.6 Claim Index - VSH application for Judicial Review

X5.7 Covering Letter - VSH application for Judicial Review (17 Nov 2014)

X5.8 Email from James Parsons re. further bridge reports (17 Nov 2014) - paper only

X5.9 Statement of Facts and Grounds - VSH application for Judicial Review

X5.10 Written statement by Michael Pocock - VSH application for Judicial Review

X6.1 VSH court papers - email from Centro to VSH re. 2004 WSP report (17 Nov 2014)

X6.2 VSH court papers - VSH letter to High Court re. urgent application for judicial review (18 Nov 2014)

X6.3 VSH court papers - Statement of Facts and Grounds

Centro documents in connection with VSH application for Judicial Review

X7.1 Acknowledgement of Service

X7.2 Letter to Court (18 Nov 2014)

X7.3 Exhibit PDA 1 to witness statement of Peter Adams

X7.4 Summary of grounds for contesting claim

X7.5 Witness statement by Peter Adams

X8 Judge's decision re. judicial review (18 Nov 2014)

Documents submitted during inquiry

X9 Inspector's note in the light of submissions made at the inquiry on 19 Nov 2014 (20 Nov 2014)

X10 Inspector's note on inquiry programme (21 Nov 2014)

X11.1 PO letter to Network Rail requesting report (21 Nov 2014)

X11.2 Email from Network Rail to Centro - info about requesting report (20 Nov 2014)

X11.3 Covering letter for first CD from Network Rail (1 Dec 2014)

X11.4 Covering letter for second CD from Network Rail (4 Dec 2014) (documents in this letter have been submitted by Centro. See CEN/INQ/27-32.2)

X11.5 PO email to all parties regarding second CD from Network Rail (7 Dec 2014)

X12 Inspector's site visit note (1 Dec 2014)

X13 Inspector's request for information: Secretary of State's Matter 11: Funding (9 Dec 2014)

X14 Inspector's Request for information: Benefit:Cost Ratio (11 Dec 2014)

X15 Inquiry closing letter (16 January 2015)